久久最新地址获取,西西4444www大胆无码,日本影片和韩国影片推荐,内射老妇bbwx0c0ck

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:2100

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
来安县| 集安市| 皮山县| 磐安县| 余姚市| 增城市| 石景山区| 南昌市| 永和县| 香港 | 鄱阳县| 高陵县| 宜兰县| 普定县| 长岭县| 仁化县| 奉节县| 和静县| 西吉县| 武宁县| 建始县| 东安县| 文登市| 雅江县| 潍坊市| 米林县| 始兴县| 江西省| 抚远县| 日喀则市| 蒙山县| 彰武县| 尼玛县| 时尚| 武隆县| 辽阳县| 怀集县| 旬邑县| 锡林浩特市| 伊宁市| 南开区|